LOS ANGELES · EST. 1932 Friday, November 20, 2026 · Pacific editionNewsroom
NUNTIA LIBERA
PER MUNDOS ET SAECULA
Los Angeles

Checking the weather…

Change locationLos Angeles

YOUR EDITION / ONE LOCATION

Make yourself at home

One choice sets your weather, local reporting and regional defaults across the Herald. You can refine each section afterward.

Use your approximate location for local news and weather?

Only Yes sends your IP address to IPWhois to find an approximate city. No keeps Los Angeles.

Search worldwide by city, state or country.

    Selected: Los Angeles.

    City search: Open-Meteo · GeoNames · CC BY 4.0

    MET NorwayCC BY 4.0

    The Aeon Herald / HERALD ORIGINAL

    France answers the oil shock with an accelerated nuclear building plan

    Prime Minister Pierre Messmer’s plan puts a rapid reactor program at the center of France’s response to expensive imported oil.

    Unlocked by patron

    France has made an accelerated nuclear construction program a central answer to the oil shock. Prime Minister Pierre Messmer's March 6 announcement commits the government to a major expansion of reactor building, turning an energy-supply problem into a far-reaching industrial decision.

    The plan calls for construction of thirteen reactors and envisages a sustained annual pace of further orders. It builds on work by the electricity utility EDF and the manufacturers responsible for the equipment. The program's scale means that generating policy, factory capacity and the financing of long construction projects must advance together.

    The attraction is clear: replacing oil-fired electricity with nuclear generation can reduce exposure to imported petroleum in that part of the energy system. It does not eliminate every dependence. Uranium supplies, fuel services and the specialized industrial chain become important parts of the new arrangement.

    Standardized plant designs and repeated construction may offer a route to faster delivery. They also make disciplined review essential. A problem repeated across several plants can become a national problem, just as an improvement can benefit a whole program. Speed and consistency require a dependable process for identifying both.

    The immediate announcement is a commitment to build, not the arrival of new electricity. Consumers will bear the financing before the full generating benefit appears. Communities will encounter choices about sites, water and emergency arrangements. The test of the plan will be whether the industrial effort can meet the promised need while providing a clear account of costs and responsibilities that extend beyond the opening of each station.

    Sources & further reading

    HERALD ORIGINAL

    THE READING ROOM

    Discussion

    Conversations are reviewed by the newsroom before they appear. Your display name and approved comment are public.

    No published comments yet.

    Join the conversation

    No email address is requested. Please keep private information out of your comment.

    Choose what this browser remembers, whether analytics may load and which external widgets can load. Necessary sign-in and security cookies are controlled by your browser.

    Analytics is optional and off until allowed. Disabling analytics stops future loading and clears accessible analytics cookies. Disabling a preference clears its local data. Learning remains a separate opt-in in Your Interests. Disabling external widgets stops future loading; remove existing provider cookies through your browser.

    Read the Cookie Policy