The Aeon Herald / HERALD ORIGINAL
Pickering brings Canada’s heavy-water reactor into large-scale service
Pickering Unit 1 enters commercial operation, making the CANDU approach a major contender in electricity generation.
Pickering Unit 1 entered commercial service on July 29, giving Ontario Hydro a major new source of electricity on the shore of Lake Ontario. The opening turns Canada's heavy-water reactor program into a large generating enterprise within reach of the Toronto region's growing demand.
The CANDU design uses heavy water to help sustain the chain reaction and natural uranium as fuel. Its pressure-tube arrangement differs from the large single pressure vessel associated with many light-water reactors. Those choices make Pickering an important test of a distinct industrial path rather than simply another example of an imported design.
A commercial starting date is not the same milestone as a first chain reaction or the first delivery of electricity to the grid. Commissioning involves successive demonstrations before a plant is accepted for routine service. Keeping those stages separate helps readers judge what an announcement actually establishes.
The station's promise comes with a wide field of work beyond power output. Fuel handling, inspection of pressure tubes, protection of workers and management of radioactive materials must become dependable operating practices. The lake supplies a setting for generation, while also making water use and environmental performance public concerns.
For Canada, Pickering offers an industrial argument as well as an electricity supply: a domestic reactor technology may support specialized manufacturing and engineering work. The evidence will come from its performance. The useful comparison with other generating systems must include availability, operating costs and safety obligations over time. Today's opening provides a new plant; the operating record will determine the value of the undertaking.
Sources & further reading
- Pickering Nuclear Generating Station Licence Renewal Application — Randy Lockwood, Senior Vice President, Pickering Nuclear, Ontario Power Generation, 2017-08-28.
- Pickering Nuclear Generating Station — Canadian Nuclear Safety Commission.
HERALD ORIGINAL


Join the conversation